Three disciplines, one subsurface decision. We describe the rock before we design the well that goes into it.

Subsurface projects fail for reasons that are already in the data — spread across the wrong documents. Our expertise is organised around the order in which the questions actually have to be answered: what is the reservoir, what do the measurements really tell us, and how should the well be built to match it.

The order matters

1

Describe the reservoir

Structural framework, continuity, rock types, seal capacity, stress and pressure. This is where the project is either possible or it is not.

2

Evaluate the measurements

Reconcile log, core, seismic and well-test data against each other. Where they disagree is usually the most informative part of the study.

3

Design the well

Only now does completion design have boundary conditions: rate, pressure ceiling, conformance, materials and well count.

Why we lead with the reservoir

Most injection projects are capitalised before they are described. A well test arrives, the number looks healthy, and the project re-labels itself feasible. Our view is that the well test is the smallest question in the sequence, and that answering the largest question first is what keeps a project financeable, permittable and insurable.

Reviewing a well test report?

We will tell you plainly what it establishes — and what it leaves untested.