A well test answers a narrow, local, mechanical question: will this borehole, at this location, accept or produce fluid at a useful rate? A reservoir description answers the question that actually decides the project: will this rock volume, as a three-dimensional geological system, accept, distribute, contain and retain that fluid for decades — and how many wells will it take?
Those two questions are routinely conflated. A report lands on a desk, shows a healthy injectivity index and a clean pressure build-up, and the project quietly re-labels itself feasible. Months later the injection well underperforms, pressure interference appears at an offset well, the modelled plume migrates in a direction nobody predicted, or a regulator asks for an area-of-review analysis the existing data cannot support.
None of those outcomes contradict the well test. The well test was never designed to see them.
What you have, and what the decision needs
The client's well
What the test report describes
- Transmissibility and skin at one location
- Injectivity index, for that fluid, on those days
- Static pressure and a local fracture gradient
- Porosity and saturation from one hole
- Fluid composition where it was sampled
Precise, defensible and local. It describes a borehole.
The project
What the reservoir must answer
- Is the interval still there a kilometre away?
- Will pressure reach, or will it hit a fault?
- Where does the CO2 go, and where does it spill?
- Does the seal hold everywhere, not just overhead?
- How many wells does this actually need?
Integrated, areal and uncertain by nature. It describes a project.
The case, in five statements
A well test is a measurement. A reservoir description is an inference — built from many measurements, constrained by geology, and honest about what remains unknown.
The radius of investigation is short. A test that senses 300 metres has sampled the reservoir the drilling engineer deliberately chose as the best rock available.
The pressure front reaches further than the plume. The area of review is drawn around the pressure front, which is why a project can affect a well the CO2 itself will never reach.
Containment is decided by capillary entry pressure, seal continuity and faults — none of which live inside a single borehole, and all of which are measurable with the right programme.
The cheapest well is the one the reservoir description told you not to drill.
Where to go deeper
The short version is above. The technical detail is deliberately one click away — the method catalogue, the seal checklist and the scope of a proper study are all published in full.
The forty-five methods we use
What each measurement reads, the volume it senses, how we use the result, and its principal limitation — from 3D seismic and seismic inversion, through image logs and NMR, to DFITs, tracers and 4D time-lapse surveys.
Open the method catalogue → ContainmentWhat a cap rock description must contain
Twelve measurable attributes — capillary entry pressure, thickness, lateral continuity, fault seal, stress state, legacy wellbores — with how each is measured and what adequate looks like.
Read the seal checklist → ScopingWhat a feasibility study should deliver
Twelve deliverables, the eight ways single-well-only studies go wrong, the screening thresholds and their limits, and the fifteen questions we ask of any proposal — including our own.
See the study scope →Buy the study, not the well
Every measurement has a price and a decision it can change. Before commissioning any test, ask which decision it informs and what the project would do differently depending on the answer. If the answer cannot change a decision, the test is data collection rather than evaluation. In practice this logic almost always favours reservoir-scale work early: a 3D survey and a proper static model frequently cost less than a single misplaced injection well, and they are the only expenditures that can prevent one.
From description to design
Once the reservoir is described, the well has boundary conditions — required rate, pressure ceiling, conformance strategy, materials and the number of wells the project needs. That is the point at which well construction becomes an engineering exercise rather than a guess, and the point at which carbon management commitments can be priced with confidence.
The full technical paper
One Well Is Not a Reservoir — 31 pages covering the seven reservoir properties, the seal framework, the scale problem, the full method catalogue, the integration workflow and the feasibility scope. Written for reviewers, regulators and technical diligence.
Download the paper (.docx, 40 KB)Have a well test in hand?
Send it over. We will tell you what it establishes, what it leaves untested, and what the next dollar should buy.