4.1 Surveillance, monitoring and verification

Monitoring is not compliance theatre. It is the only mechanism that detects a containment surprise early enough to do something about it, and the only evidence that will still exist in twenty years when the project is being judged.

MethodWhat it measuresScale / radius of investigationHow we use the dataPrincipal limitations
Downhole pressure and temperature gaugesContinuous bottom-hole pressure and temperature, injectivity trends, pressure communicationThe well, plus inference into the connected volumePressure management; injectivity decline detection; model history matchingGauge drift; a single point represents a large volume
Distributed temperature and acoustic sensing (DTS/DAS)Temperature profile along the well, acoustic events, flow allocation, microseismicAlong the entire wellboreInjection profile, leak detection in well and behind casing, fracture growthLarge data volumes; interpretation intensive
4D (time-lapse) seismicPlume geometry, gas saturation change, pressure-related velocity changeWhole reservoirThe only direct, volumetric view of where the CO2 actually went; corrects the dynamic modelRequires a baseline survey; expensive; thin or low-saturation plumes are hard to image
Repeat VSP and cross-well seismicHigher-resolution plume and seal imaging near wellsTens to hundreds of metres from the wellDetailed plume and seal integrity assessment around critical locationsSparse spatial coverage
InSAR and surface deformation monitoringMillimetre-scale uplift or subsidence; validation of the pressure modelKilometres, whole-field footprintIndependent check on reservoir-scale pressure behaviour and fault reactivationAtmospheric and vegetation noise; requires careful processing
Shallow groundwater, soil gas and atmospheric monitoringBaseline and time-lapse chemistry and gas flux in the area of reviewShallow subsurface to surface, metres to kilometresLeakage detection; regulatory compliance; public assuranceNatural variability is large; baseline quality determines usefulness
Well integrity loggingCement bond, casing corrosion, annular pressure, ultrasonic imaging of barriersCentimetres around each wellboreConfirms barrier integrity of injection and legacy wells in the area of reviewIndirect; does not detect flow paths away from the wellbore

4.2 How the data become a decision

Data do not become a decision by accumulation. They become one through a sequence of reconciliations, each of which either raises confidence or exposes a contradiction worth resolving before capital is committed.

1

Frame the decision

State what the study must decide — capacity, injectivity, well count, containment, permit strategy — and what would change the answer.

2

Structural framework

Interpret seismic, tie to wells, map top and base, and map every fault in the area of review.

3

Stratigraphy and petrophysics

Correlate flow units, define rock types, calibrate logs to core, populate properties with stated cut-offs.

4

Seal model

Apply the cap rock framework, including fault seal analysis, and quantify the supportable column height.

5

Geomechanical model

Derive the stress tensor and compute the pressure envelope for reservoir, seal and faults.

6

Static model and ranges

Generate multiple realizations, not one. The spread between them is a finding, not a nuisance.

7

Flow simulation

History-match what exists; where nothing exists, replace it with honest sensitivity analysis.

8

Forecast, then design

Plume, pressure, well count and completion design all come out of the dynamic model.

9

Surveillance plan

Target the specific uncertainties the model cannot resolve: migration direction, seal integrity, fault behaviour.

10

Residual risk

End with a ranked risk register, detection methods and decision triggers — not with "no significant risk".

Reconciliation is the method

When log porosity, core porosity, seismic impedance and well-test kh all agree, the model is credible. When they disagree, the disagreement is the most informative data in the project. Value of information follows the same logic: before commissioning any test, ask which decision it informs and what the project would do differently depending on the answer. If the answer cannot change a decision, the test is data collection rather than evaluation.

Where this all leads

The sequence above is the workflow behind every study we issue. Its output is not a verdict but a distribution — capacity at P90 to P10, a well count with a range, a plume that stays inside the spill point with a stated probability, and a monitoring plan designed to catch the specific things the model could not resolve.